No products
View larger
The document contains requirements for the utilization of soil material with and without pretreatment. Soil material according to this document is excavated soil or dredged material, usually deriving through construction, maintenance and rehabilitation processes. Out of scope is the deposition of soil material into existing waters and cavitations (fillings).
| Author | DIN |
|---|---|
| Editor | DIN |
| Document type | Standard |
| Format | File |
| Cancellation date | |
| Confirmation date | |
| expiration_de_validite | |
| ICS | 13.080.01 : Soil quality and pedology in general
|
| Number of pages | 13 |
| Replace | DIN 19731 (1995-08) |
| Cross references | ISO 15176 (2002-10), MOD |
| Set | Handbuch der Bodenuntersuchung-2000 |
| Year | 1990 |
| Document history | DIN 19731 (1998-05) |
| Country | Germany |
| Keyword | 19731 |